Draw the Bill of Material (BOM) tree for the front and rear

Post New Homework

MHH624713 Industrial Studies - National University of Science and Technology

SECTION - A

Question 1: In this question each student is required to conduct a market survey and provide the following analysis. Critically evaluate any two products (name of the product, specifications of the product, manufacturers details etc) of electronics goods or automobile goods and justify which brand product is the market leader in Oman and discuss what are the marketing strategies required to make a good decision to be a market leader. (Using your analysis with 400-500 words approx.).

Each student should visit the local marketplace places, select any product (electronic / automobile/ any other consumer products) available in the Oman market, study the product in detail and provide valid information.

Question 2: Break-even analysis helps a manager to clearly understand the nature of relevant costs and their importance in managerial decision making, resulting in that the manager can take more soundly decisions and is more confident about their eventual outcome'. Justify how it is relevant to any manufacturing industry, supporting your answer with an example. (Using your sentences with 400-500 words approx.)

NOTE:
Section - The evaluation will be done based on the technical information, language skills and clarity in the contents with subje ct knowledge are essential. Students are advised to proof read the entire report once completed before uploading it, and the report should be free from language errors and the similaruty shoul; not exceed 15% safe assign. CCE/NU Harvard reference sheet should be submitted along with the report.

SECTION - B

Question 3: ABC steel plant industry plans to manufacture a product. The product needs a special component. The industry has reviewed that the special component can be produced in the plant or bought in. An investment is required to start the production of the component for which two mutually exclusive projects A and B representing different production processes are available. The alternative option is to buy in from another company representing project C. The details of projects A and B are given in Table 3:

(i) Using the information from table 3 and Discount Cash Flow criteria, calculate Pay Back Period (PBP), Account Rate of Return (ARR), Net Present Value (NPV) and
Internal Rate Return (IRR) for project A & Project B if the industry plans to sale the unit cost of RO 350.
[Marking Rubrics: Back Period (PBP) for the project A & project B - 4 Marks, Account Rate of Return (ARR) for project A & project B - 4 Marks, Net Present Value (NPV) for the project A & project B - 8 Marks, and Internal Rate Return (IRR) for the project A & project B - 12 Marks.]
(ii) Using the annual cost data from table 3, determine which project incurs less cost if the industry considers producing 7, 500 units per year.
(iii) Using the table 3, determine the Break-Even quantity and margin of safety (units and value) If the company sells 8,000 units of new product per year at a price of RO 50 per unit.

Table 3

Description

Project-A

Project-B

Capital (RO)

366,170

469,550

Life (years)

15

15

Sales Quantity (units per year)

10,000

12,000

Salaries per year (RO)

45,000

50,000

Other fixed costs per year (RO)

40,000

85,000

Wages per year (RO)

70,000

80,000

Cost of materials per year (RO)

214,740

299,020

Other variable costs per year (RO)

35,000

40,000

Scrap value at the end of the year (RO)

31,200

43,090

Cost of capital (%)

13

13

Question 4: M/S XYZ Company Manufactures Sports bikes and supplies them to the local market. A local sub-contracting manufacturer supplies the wheels to the M/S XYZ Company through a purchase contract. The sub-contracting company initially purchases aluminium billets as raw material and manufactures wheels by forming each billet into wheel rims. Both the rims (front and rear) are assembled with spokes, front and rear hubs. Front wheels comprise a front rim, 24 spokes and a front hub. Rear wheels comprise a rear rim, 24 spokes and a rear hub.
(i) Draw the Bill of Material (BOM) tree for the front and rear wheels.
(ii) Referring to table 4(i) and 4(ii), complete the Material Requirements Planning (MRP) and determine when to Purchase Orders placed for the spokes.

Table 4 (i)

Week

12

13

14

15

16

17

Demand for the bikes

80

70

90

120

100

85

Demand of Front Rim

50

-

40

30

-

125

The demand of Rear Rim

-

70

60

-

80

-

Table 4 (ii)

Part/Component

Lead Time

Stock on Hand

Batch Size

Safety Stock

Bike

1

200

100

0

Front wheel

1

100

120

100

Rear wheel

1

80

150

125

Front Rim

2

60

150

100

Rear Rim

2

190

100

100

Front Hub

1

100

150

50

Rear Hub

1

140

100

50

Spokes

1

8200

3,000

1,100